Medicine Hat Compressor

Hilton Brothers, alongside Ellis Don Industrial, constructed a new compressor station for Trans Canada Pipelines, located just north of Medicine Hat, AB. Construction required a site specific safety plan to accommodate an existing 20” underground high pressure gas line at the entrance to the new site. Adhering to a strict environmental management plan, scope included stripping, grading, and gravel placement, as well as establishing drainage and construction of a new concrete outfall structure complete with sluice gate.

Site Construction for EllisDon and TransCanada Pipelines